Blog

Planning an asbestos survey before renovation

An asbestos survey identifies asbestos-containing materials before renovation. Scope the survey around the planned demolition so contractors can assess safe working methods and price the work.

Arrange the survey before committing to demolition

You cannot reliably identify asbestos by appearance. Leave suspected materials undisturbed and ask an appropriately qualified professional to assess them. Check the survey, removal and waste requirements that apply where the property is located.

Do not take samples or open up suspected materials yourself. Ask a qualified survey professional to determine what needs examination and sampling. Allow time for the results before finalizing the renovation contract.

Match the survey to the planned work

Provide the building’s age, information about earlier renovations, and any existing reports. Identify the surfaces and structures that will be demolished or opened, including any parts of the scope that are still uncertain.

An older report may cover only one room or one layer of material. Ask the professional to check whether it covers the proposed work. If the project expands, reassess the survey before disturbing a new area.

Use the report in the quote request

Request a written report that clearly states the limits of the survey, and give the same information to every demolition bidder. Ask the quote to account for the necessary containment, removal, waste handling, and completion records.

A finding can change working methods, the schedule, and whether you can stay in the home. Clarify these effects in advance. Agree that affected work will stop for investigation if previously unexamined materials are uncovered. Compare the cost of demolition only once the quotes cover the same scope.

Details for your local project

Include the city, state and ZIP code, and state dimensions with their units. Ask the contractor which permits and inspections apply to this address. In a condo or managed community, check the association’s alteration process separately from public building permits; confirm both before work starts.

The EPA explains why suspected asbestos should be left undisturbed and assessed by trained professionals. Confirm the requirements for this particular project with the appropriate state and local authorities.

Further information: US Environmental Protection Agency (opens in a new tab)

Related guides

Demolition: costs and what affects the price

Describe what you need in your own words. Helmi Search helps clarify the details and prepares a quote-request draft from the conversation. Check the draft and recipients before approving sending. Once you have compared the quotes, agree on any order separately with your chosen provider.

Start with Helmi Search (opens in a new tab)